Sylva Commercial Waterproofing
Sylva Commercial Waterproofing
Commercial · New construction · Rub-R-Wall membrane · Insulation sheets
A new commercial build in Sylva needed its foundation waterproofed to pass inspection. The builder marked the waterproofing line, and the foundation was sealed and insulated in one day.
Location
Sylva, NC
Scope
Waterproofing + insulation
Duration
1 day
Products
Rub-R-Wall, insulation sheets
The Problem
New construction has to be waterproofed to meet code, and the builder needed it done before backfill and inspection.
Every builder’s plan is different. Some jobs need drainage. This one called for foundation waterproofing and insulation only.
The Work Performed
Wall prep (walls fully dried)
Rub-R-Wall membrane
Insulation sheets
The Results
The foundation passed inspection and meets code. The builder got a fully waterproofed, insulated foundation in one day, ready for backfill.
For builders, that means waterproofing done to plan and on time for inspection.
Have A Similar Problem?
If your basement is showing any of the same signs of water after rain, damp walls, a foundation that won’t stay dry it’s worth getting ahead of it. Request a free assessment, and we’ll walk the property, explain what’s happening, and give you a clear next step.
Request a Free Waterproofing Assessment